ABNT Global Sdn Bhd

Our Projects

Seawater Desalination Treatment Plant

This system is upgrading from existing 2.5mlds to 8.0 mlds, capable of desalinating seawater into reverse osmosis (RO) water, which can be used as an industrial water supply.

Water Reclamation System – Nano Filtration

ABNT and Jetama Sdn. Bhd, a subsidiary of Sabah Development Berhad (SDB), implemented 12 units of Solar-Powered and Battery Energy Storage System, Nano Filtration Drinking Water System to help address the issue of drinking water supply in remote or disaster-affected areas.

Libya Housing Project

Infrastructure works and servicesCivil & M&E works of a town ship development. Including :- 10,680 units of 4-storey residential apartments, facilities building, pipe jacking and microtunnelling, and 190 MWV power plants, 300MLD water treatment plants, Sewage Treatment plans.

Construction Of Directional Water Pipe

Construction Of Directional Water Pipe At Senai Desaru Expressway Intersection – Bandar Penawar, Johor Excavation work to install 600mm water pipe and material in connection with construction or demolition works using tools, machinery. Excavation work includes earthwork, trenching, cofferdam, caisson, well, shaft, tunnel or underground working and laying pipe, joining.

Construction of Forest City STP No. 2

This system is upgrading from existing 2.5mlds to 8.0 mlds, capable of desalinating seawater into reverse osmosis (RO) water, which can be used as an industrial wataExecute and Complete Civil & Structure Works, Supply and Installation Mechanical & Electrical Works, Road Works, Greening, Water Works, Piping Works, SCADA er supply.

Construction of Golf STP No. 2

Execute and Complete Civil & Structure Works, Supply and Installation Mechanical & Electrical Works, Road Works, Greening, Water Works, Piping Works, SCADA

Operation and Maintenance of STP No.3

Operation and Maintenance of works for STP 3 and Water Pump Room

Construction of Forest City STP No. 3

Execute and Complete Civil & Structure Works, Supply and Installation Mechanical & Electrical Works, Road Works, Greening, Water Works, Piping Works, SCADA

Fibre Optics Installation

Excavation work for 79 KM, to install fiber optic cable and material in connection with construction or demolition works using tools, machinery or explosives to form an open face, hole or cavity.

Communication Infrastructure

Installation of Backhaul (BH) Module. To deliver a broadband connection to the Access Point Cluster from one building to another at remote location.

RFID Toll System

Installation of Radio Frequency Identification (RFID) at Toll Plazas Southern Region of Malaysia

Serdang Hospital

Services involve procurement, inspection, quality assurance and quality control of medical and related equipment, communication technology and etc. Also providing building and equipment maintenance during the first two years of hospital operations.

Residential Projects

Civil & M&E works of 10,680 units of 4-storey residential apartments, facilities buildings, common and local infrastructure works and services.

Fibre Optics Installation

Excavation work for 2600m, to install fiber optic cable and material in connection with construction or demolition works using tools, machinery or explosives to form an open face, hole or cavity.

Security Command Center

To design and build new Polis Bantuan Command Center at International Islamic University Malaysia Kuantan Campus

Spot Billing System

Supply, installation and commissioning of the Spot Billing Systems for the entire Johor State Agency.

Water Plant Command Center

To design and build Semanggar Water Treatment Command Center. Integrated with Scada Systems and Connect to Head Office.

Expressway Project

Turnkey Solution Development on Expressway maintenance system “EMS”.

Info System

To design and build Ranhill SAJ Info Center at Ranhill SAJ Head Office. To monitor the whole Johor water status and helpdesk of each agency.

Disaster Recovery Center

To construct a new Disaster Recovery Center at Wisma Zurich Johor Bahru. This disaster recovery plan center , DRP is a center for business continuity in the event of a disaster that destroys part or all of a business’s resources, including IT equipment, data records and the physical space of Ranhill.

IT Command Center

To construct a new IT Command Center at Ranhill Holding Berhad, Johor Bahru. This IT Command Center allow automated detection and response reduce risk without disruption.

Vertical Transport System

Specialist Works for The Installation and Commissioning of Vertical Transportation System (Gondola) at Sungai Johor Bridge Pylons, Senai-Desaru Expressway (E22).

Sewerage Works

Convert Small Septic Treatment System (SSTS) is employ with the Packaged Prefabricated Fibre-reinforced plastic (FRP) Tank to cater for 150PE flow.